Cruz, C O, Marques, R C and Pereira, I (2015) Alternative Contractual Arrangements for Urban Light Rail Systems: Lessons from Two Case Studies. Journal of Construction Engineering and Management, 141(03).

  • Type: Journal Article
  • Keywords: Contractual arrangements; Public-private partnership (PPP); Risk sharing; Urban light rail systems (ULRS); Contracting;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000942
  • Abstract:
    The need to improve urban transportation systems in order to decrease travel time and increase their reliability while keeping the costs at an affordable level has led governments to develop public-private partnership (PPP) arrangements in urban light rail systems. Many cities around the world have used the PPP model for the construction of urban light rail systems, particularly light rail, since it provides a quicker and easier answer to financing these large investments. However, different models have been adopted. In most cases a typical design–build–operate–transfer model, with long duration (e.g., 30 years), is used, but other innovative models have also been adopted (e.g., a hybrid model with different contracts for infrastructure construction and maintenance—a 20-year contract—and another for the systems operation—a 5-year contract). This paper addresses the advantages and disadvantages of these models, using one case study for each model. The conclusions show that the hybrid model has the potential to decrease the operation costs, but at the same time to mitigate the interface risk (operation <-> infrastructure).

Hwang, S, Park, M, Lee, H, Lee, S and Kim, H (2015) Postdisaster Interdependent Built Environment Recovery Efforts and the Effects of Governmental Plans: Case Analysis Using System Dynamics. Journal of Construction Engineering and Management, 141(03).

Liu, C and Lu, M (2015) Optimizing Earthmoving Job Planning Based on Evaluation of Temporary Haul Road Networks Design for Mass Earthworks Projects. Journal of Construction Engineering and Management, 141(03).

Naderpajouh, N, Hastak, M, Gokhale, S, Bayraktar, M E, Iyer, A and Arif, F (2015) Counterfeiting Risk Governance in the Capital Projects Supply Chain. Journal of Construction Engineering and Management, 141(03).

Obiozo, R N and Smallwood, J J (2015) Biophilic Construction Site Model: Enhancing the Motivational and Humanistic Value of the Green Construction Site. Journal of Construction Engineering and Management, 141(03).

Shuster, W D, Burkman, C E, Grosshans, J, Dadio, S and Losco, R (2015) Green Residential Demolitions: Case Study of Vacant Land Reuse in Storm Water Management in Cleveland. Journal of Construction Engineering and Management, 141(03).

Su, Y and Lucko, G (2015) Synthetic Cash Flow Model with Singularity Functions. I: Theory for Periodic Phenomena and Time Value of Money. Journal of Construction Engineering and Management, 141(03).

Su, Y and Lucko, G (2015) Synthetic Cash Flow Model with Singularity Functions. II: Feasible Prompt Payment Discount Scenarios. Journal of Construction Engineering and Management, 141(03).

van Buiten, M and Hartmann, A (2015) Asset Management Perspective on the Duration of Public-Private Partnership Contracts: Cost-Control Trade-off?. Journal of Construction Engineering and Management, 141(03).

Zhao, X, Hwang, B, Pheng Low, S and Wu, P (2015) Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms. Journal of Construction Engineering and Management, 141(03).